Photo Gallery >> |
|
| |
|
|
Project Name |
 |
 |
|
|
Client |
 |
 |
|
| |
|
|
Signal Maintenance Platoon (SMP)
Compound at Dagger (Design/Build) |
 |
|
 |
|
|
TRO |
 |
 |
|
| |
|
|
Signal
Maintenance Platoon (SMP)
Compound at Kasik (Design/Build) |
 |
|
 |
|
|
MRO |
 |
 |
|
| |
|
|
Special Weapons & Tactics (SWAT)
Compound at Samarra (Design/Build) |
 |
|
 |
|
|
TRO |
 |
 |
|
| |
|
|
Tikrit Location
Command (TLC) Design /
Build |
 |
|
 |
|
|
USACE GRD |
 |
 |
|
| |
|
|
JCCI/ and BTA International Zone (IZ)
Master Plan Design |
 |
|
 |
|
|
Joint Contracting Command |
 |
 |
|
| |
|
|
Abu Ghraib Water Treatment Plan Design
and Construction |
 |
|
 |
|
|
Iraqi MoMPW |
 |
 |
|
| |
|
|
Iraqi Ministry of
Municipality and Public
Works |
 |
|
 |
|
|
Iraqi Ministry Of Higher Education |
 |
 |
|
| |
|
|
Rehabilitation of five Pump Stations at Sadr
City South |
 |
|
 |
|
|
WII / BV JV |
 |
 |
|
| |
|
|
Rehabilitation of Six Lift Stations at Sadr
City North |
 |
|
 |
|
|
WII / BV JV |
 |
 |
|
| |
|
|
Installation of
new PVC Sewer Trunks at
Sadr City |
 |
|
 |
|
|
WII / BV JV |
 |
 |
|
| |
|
|
Rehabilitation of
Sadr City Sewer Network,
Manholes, and Cash basins |
 |
|
 |
|
|
WII / BV JV |
 |
 |
|
| |
|
|
Two Substation Erection
and Commissioning
at Camp Gunslinger |
 |
|
 |
|
|
MNFI |
 |
 |
|
| |
|
|
Rehabilitation of Baghdad – rustomaya trunk
line penstocks |
 |
|
 |
|
|
WII / BV JV |
 |
 |
|
| |
|
|
Rehabilitation of Baghdad – rustomaya
Sewer trunk line |
 |
|
 |
|
|
WII / BV J |
 |
 |
|
| |
|
|
Sewer network
cleaning and jetting at Sadr
City south and Sadr City north |
 |
|
 |
|
|
WII / BV JV |
 |
 |
|
| |
|
|
Design and built
of Al-Kamalia and Al
-Obaidy sewer trunks |
 |
|
 |
|
|
USACE GRD |
 |
 |
|
| |
|
|
150 Man Camp at
Presidential Compound |
 |
|
 |
|
|
WII / BV JV |
 |
 |
|
| |
|
|
100 Man Camp at
Victory Camp |
 |
|
 |
|
|
Washington International |
 |
 |
|
| |
|
|
Power Generation /
Substation Erection at
Victory Camp |
 |
|
 |
|
|
Washington International |
 |
 |
|
| |
|
|
Bankers and Force Protection Barriers For
Taji and Qudos Power Stations |
 |
|
 |
|
|
Fluor Intercontinental |
 |
 |
|
| |
|
|
Tow- Kilometer Pipeline Construction For
Qudos Substation |
 |
|
 |
|
|
Fluor Intercontinental |
 |
 |
|
| |
|
|
Man Camp at Victory Camp / Contractors
Village |
 |
|
 |
|
|
Fluor Intercontinental |
 |
 |
|
| |
|
|
Water Treatment
System at Presidential
Compound |
 |
|
 |
|
|
Fluor Intercontinental |
 |
 |
|
| |
|
|
Man Camp at Presidential
Compound |
 |
|
 |
|
|
USACE GRD |
 |
 |
|
| |
|
|
Oil Pipe For
Qudos Power Station |
 |
|
 |
|
|
Fluor Intercontinental |
 |
 |
|
| |
|
|
Crossroad Bridge
For Qudos Power Station |
 |
|
 |
|
|
Fluor Intercontinental |
 |
 |
|
| |
|
|
Foundations Reinforcement and Civil Works
for Qudos Power Station |
 |
|
 |
|
|
Fluor Intercontinental |
 |
 |
|
| |
 |
28 |
 |
|